Results

BMPs work! Stormwater runoff from the LID subdivision was much lower than from the traditional subdivision during construction. And, BMPs continued to work! After construction, stormwater runoff was unchanged from pre-development levels.

Non-Technical Results  (general findings)

Learn more about what happened in the traditional and LID subdivision both during construction and post-construction.

Traditional Subdivision

LID Subdivision

Technical Results  (more detailed findings)
Final Report  (most detailed findings)
Recommendations

Glossary of Terms

Back to Top



Overview | Timeline | BMP Tour | Results | Testimonials | Photo Gallery
Home | Publications | Contact Us | About Website | Glossary

© University of Connecticut | College of Agriculture and Natural Resources